Skip to main content

NASA’s Artemis I launch postponed following fuel leak issue

Following two failed launch attempts of its new Space Launch System rocket, NASA has announced it will not be making another launch attempt in the next few days. The launch, which was to kick off the Artemis I mission, was originally scheduled for Monday, August 29, but this attempt was scrubbed due to an issue with one of the rocket’s engines. A second attempt was made yesterday, Saturday, September 3, but this launch was also scrubbed due to a liquid hydrogen leak. The launch window for this period does extend until Tuesday, September 6, but NASA has ruled out making another launch attempt during this time.

“We’re not going to launch until it’s right,” said NASA director Bill Nelson in a press conference following yesterday’s scrubbed launch.

Recommended Videos

The problem was a leaking quick disconnect attached to the rocket’s core stage, through which liquid hydrogen fuel is loaded. The liquid hydrogen tank was filled up to over 10% of its capacity, but several attempts to fix the leak weren’t successful and the decision was made to scrub the launch.

A NASA update suggested that human error could have contributed to the problem. “While in an early phase of hydrogen loading operations called chilldown, when launch controllers cool down the lines and propulsion system prior to flowing super cold liquid hydrogen into the rocket’s tank at minus 423 degrees F, an inadvertent command was sent that temporarily raised the pressure in the system,” NASA wrote. “While the rocket remained safe and it is too early to tell whether the bump in pressurization contributed to the cause of the leaky seal, engineers are examining the issue.”

At a briefing, NASA Artemis mission manager Mike Sarafin emphasized that the rocket hardware was safe, but that the leak was a significant one. He said that a launch in the next few days of the launch window was “definitely off the table” and that a launch attempt within the next two launch windows was possible but would depend on the findings of the teams examining the issues from this attempt.

The next launch windows, which are dependent on the relative movements of Earth and the moon, are in late September to early October, and in the later half of October. However, a further complication is a potential conflict with the launch of the SpaceX Crew-5 mission to the International Space Station, scheduled for October 3.

Georgina Torbet
Georgina is the Digital Trends space writer, covering human space exploration, planetary science, and cosmology. She…
How to watch NASA’s private mission arrive at space station
SpaceX's Crew Dragon spacecraft.

NASA Live: Official Stream of NASA TV

A SpaceX Crew Dragon capsule is currently flying NASA’s second all-private mission to the International Space Station (ISS).

Read more
Watch NASA successfully launch all-private mission to ISS
The all-private Ax-2 mission launches from the Kennedy Space Center.

SpaceX and Axiom Space successfully launched NASA’s second all-private mission to the International Space Station (ISS) on Sunday.

Four crewmembers -- two Americans and two Saudi Arabians -- lifted off from the Kennedy Space Center in Florida using a SpaceX Falcon 9 rocket at 5:37 p.m ET on Sunday.

Read more
How to watch NASA’s all-private crew launch to the ISS on Sunday
SpaceX's rocket on the launch pad for the crewed Ax-2 mission.

Ax-2 Mission | Launch

Four private citizens are about to blast off from the Kennedy Space Center in Florida for a spacecraft ride to the International Space Station (ISS).

Read more