Skip to main content

NASA eyes two dates for third try at Artemis moon rocket launch

Following two failed attempts to launch its next-generation rocket toward the moon, NASA says it’s now eyeing a couple of dates later this month for a third try at getting it off the ground.

Launch windows for the highly anticipated Artemis I mission will open on September 23 and September 27, NASA experts said on Thursday, though there are still a number of issues that could leave the space agency looking at an October launch instead.

Recommended Videos

NASA’s new Space Launch System rocket was supposed to embark on its maiden flight on August 29, but an issue with one of the engines prompted engineers to halt the countdown clock 40 minutes from launch. A second launch attempt on September 3 was also called off due to a hydrogen fuel leak.

NASA is aiming to fix the fuel leak issue with the rocket still on the launchpad at the Kennedy Space Center in Florida. The current plan is to check the success of the fix by fueling the rocket on September 17. Four days are needed between the check and the launch, so if the fueling date slips — and a NASA official said that it could — then engineers still have a couple of days to conduct the procedure in time for a September 23 liftoff.

However, there’s another issue that could leave NASA having to haul the rocket back to the nearby Vehicle Assembly Building, forcing a longer delay. It involves the batteries for the rocket’s flight termination system (FTS), which is designed to destroy the rocket in midair if it veers off course at launch.

Current rules stipulated by Space Launch Delta 45 — a unit of the Space Force that oversees Florida rocket launches to ensure the safety of people on the ground and out at sea — mean that the FTS batteries have to be charged and the system fully checked, a process that usually takes place inside the Vehicle Assembly Building and which would earn NASA a 20-day permit for launch.

The space agency is hoping to have the current permit extended to avoid having to return the rocket to the Vehicle Assembly Building. If NASA ends up having to remove the rocket from the launchpad, it’ll have to scrub the two September dates and look instead to October. Space Launch Delta 45 is expected to announce its decision soon.

When it finally takes place, NASA’s new Space Launch System (SLS) rocket will propel an uncrewed Orion spacecraft toward the moon where it’ll perform a fly-by before returning to Earth about six weeks later. A successful mission will pave the way for crewed voyages, including the first astronaut lunar landing in five decades.

Also, the space agency said the two September dates were chosen to avoid any conflict with its DART mission, which will send a spacecraft crashing into an asteroid on September 26. The mission will test whether a spacecraft can change the path of a large asteroid heading toward Earth, though rest assured, the target space rock that’s involved in DART’s mission poses no threat to our planet.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA and SpaceX target new Crew-6 launch date after scrubbed effort
Crew-6 astronauts aboard a SpaceX Crew Dragon capsule.

After NASA and SpaceX scrubbed the launch of Crew-6 just a couple of minutes before lift-off early on Monday morning, officials have announced they're now targeting Thursday for the next launch effort.

The team called off Monday’s launch attempt at the Kennedy Space Center in Florida when it suddenly encountered an issue in the ground systems affecting the loading of the ignition fluids for the Falcon 9 rocket that will carry the astronauts to the International Space Station (ISS) inside the Crew Dragon Endeavour capsule.

Read more
NASA shares Orion moon video on anniversary of iconic Earthrise image
As Earthrise as seen from the Orion spacecraft in 2022.

NASA has shared some incredible footage showing Earth rising behind the moon.

It was captured on November 28 as Orion orbited our nearest neighbor during the Artemis I test mission, which saw the first flight of NASA’s next-generation Space Launch System (SLS) rocket.

Read more
Watch 25-day Orion mission squeezed into just 60 seconds
NASA's Orion spacecraft as it flies by the moon.

The European Space Agency (ESA) has shared a cinematic video that encapsulates the recent Artemis I mission in just 60 seconds.

That’s packing a lot in for a voyage that lasted 25 days, but we’re sure you’ll agree, the presentation does a great job in pulling together the mission’s key moments while also including some of the mesmerizing imagery captured by the Orion spacecraft during its rendezvous with the moon.

Read more