Skip to main content

NASA’s Space Launch System rocket arrives at Kennedy. Next stop: the moon

After completing its journey from NASA’s Michoud Assembly Facility aboard the Pegasus barge, teams with Exploration Ground Systems transport the agency’s powerful SLS (Space Launch System) core stage to NASA’s Kennedy Space Center’s Vehicle Assembly Building on July 23.
After completing its journey from NASA’s Michoud Assembly Facility aboard the Pegasus barge, teams with Exploration Ground Systems transport the agency’s powerful SLS (Space Launch System) core stage to NASA’s Kennedy Space Center’s Vehicle Assembly Building on July 23. NASA/Isaac Watson

NASA’s epic Space Launch System rocket, standing 322 feet tall when fully stacked, has recently been on an similarly epic journey — traveling from New Orleans to Florida via barge. The rocket began its journey more than two weeks ago, and having covered more than 900 miles has now arrived safe at the Kennedy Space Center.

The core stage was manufactured and assembled at the Michoud Assembly Facility, and had to travel to Kennedy to be ready for integration and testing ahead of the Artemis II test flight. It will be used to carry crew members on a 10-day journey around the moon and back, including NASA astronauts Victor Glover, Christina Koch, and Reid Wiseman plus Canadian Space Agency astronaut Jeremy Hansen.

Recommended Videos

“With Artemis, we’ve set our sights on doing something big and incredibly complex that will inspire a new generation, advance our scientific endeavors, and move U.S. competitiveness forward,” said Catherine Koerner, associate administrator for NASA’s Exploration Systems Development Mission Directorate, when the core stage set off on its journey. “The SLS rocket is a key component of our efforts to develop a long-term presence at the Moon.”

Before the launch, however, there’s still a lot of work to be done to get the core stage ready for flight. It is now in the Vehicle Assembly Building at Kennedy, where it will be set into the mobile launcher — the platform that hooks it up to the ground systems — and integrated with the Orion spacecraft that will house the crew. In addition, the core stage need to have its twin solid rocket boosters and launch vehicle stage adapter added, and then the entire assembly will need thorough testing to ensure it’s ready to fly.

Artemis II is currently scheduled for September next year, following on from the Artemis I mission in November 2022 that saw an uncrewed version of the SLS and Orion capsule travel around the moon and back to Earth. That mission was a success; however, some components were damaged during the launch, and the launch of the first crewed mission was pushed back to accommodate more time for development and integration.

The long-term plan is to return humans to the surface of the moon for the first time in more than 50 years in the Artemis III mission, tentatively scheduled for September 2026.

Georgina Torbet
Georgina has been the space writer at Digital Trends space writer for six years, covering human space exploration, planetary…
SpaceX Crew-9 launch delayed again because of Tropical Storm Helene
SpaceX’s Falcon 9 rocket, with the Dragon spacecraft atop, is vertical at the launch pad of Space Launch Complex-40 at Cape Canaveral Space Force Station in Florida on Tuesday, Sept. 24, 2024, ahead of NASA’s SpaceX Crew-9 launch to the International Space Station.

As Florida braces for the arrival of Tropical Storm Helene, the launch of NASA's Crew-9 mission from the Kennedy Space Center has once again been delayed. The launch of two astronauts to the International Space Station (ISS) was originally set for Thursday, September 26, but has now been pushed back to 1:17 p.m. ET Saturday, September 28.

"The change allows teams to complete a rehearsal of launch day activities Tuesday night with the SpaceX Dragon spacecraft and Falcon 9 rocket, which rolled to Space Launch Complex-40 earlier in the day. Following rehearsal activities, the integrated system will move back to the hangar ahead of any potential storm activity," NASA wrote in an update. "Although Tropical Storm Helene is moving through the Gulf of Mexico and expected to impact the Florida panhandle, the storm system is large enough that high winds and heavy rain are expected in the Cape Canaveral and Merritt Island regions on Florida’s east coast."

Read more
How to watch SpaceX’s Crew-9 launch to the ISS on Saturday
Crew-7's Falcon 9 rocket and Dragon spacecraft on the launchpad.

[UPDATE: SpaceX has called off Thursday's launch attempt due to an approaching storm. It's now targeting 1:17 p.m. ET on Saturday, September 28.]

SpaceX and NASA are gearing up for the Crew-9 launch that will carry an American astronaut and a Russian cosmonaut to the International Space Station (ISS) aboard a SpaceX Crew Dragon spacecraft.

Read more
Europa Clipper overcomes transistor issue and is ready for launch next month
Europa Clipper.

This May, engineers working on NASA's Europa Clipper had to deliver the kind of news that no one wants to announce: There was a problem with the transistors on their spacecraft. Europa Clipper is heading to the moon of the same name, which orbits around Jupiter -- and that giant planet has an intense environment of radiation around it that is hostile to electronics. Engineers were concerned that some of the transistors may be damaged by that radiation, potentially shortening the life of the spacecraft.

Engineers told The New York Times of reacting to the issue with a "howl of terror." They worked on the problem throughout the summer, scrambling to figure out how many transistors would be affected and what impact that could have on the spacecraft and its mission. With launch date quickly approaching, they had only a short window to work in.

Read more