Skip to main content

Puerto Rico's governor wants Elon Musk to renew the island's electrical grid

Elon Musk
Heisenberg Media
In the wake of the devastation wrought by Hurricane Maria, Puerto Rico is still without power. The island’s infrastructure was due for an upgrade even before the recent natural disaster, and now it seems that one of the biggest names in the technology industry might be taking on the mission to make that happen.

SpaceX and Tesla CEO Elon Musk has already sent hundreds of its Powerwall batteries to Puerto Rico as a stopgap. On Thursday, October 5, he took to Twitter to state that his company has the means to provide the necessary support to rebuild its power grid.

Recommended Videos

“The Tesla team has done this for many smaller islands around the world, but there is no scalability limit, so it can be done for Puerto Rico too,” tweeted Musk. He went on to stress that the company would need the blessing of the Puerto Rican government, the Public Utility Commission, any commercial stakeholders, and the island’s residents.

Puerto Rico’s governor Ricardo Rossello responded to Musk just hours later, according to a report from the Huffington Post. He suggested that the island could be a “flagship project” for Tesla’s technology, giving the company an opportunity to demonstrate just how effective its methods of harvesting and storing solar power can be.

Last year, Tesla subsidiary SolarCity led a project that installed a microgrid system on the island of Ta’u in American Samoa. As a result, the company stated that almost 100 percent of its power needs would be catered to by renewable energy.

This new technology obviously has some major benefits from an environmental perspective. It’s also much more reliable, and would likely be more resilient when future storms roll in — not to mention cheaper to run than the current system, which relies on imported oil.

There are big questions to be asked about the timescale of the project, as there is a pressing need to return power to residents. It took a year to install the microgrid system on Ta’u, an island that spans just 17 square miles. Puerto Rico is much larger, at 3,515 square miles.

Musk is confident that scalability won’t be an issue, but for residents of Puerto Rico, such a dramatic overhaul of the power infrastructure might take too long to come to pass.

Brad Jones
Former Digital Trends Contributor
Brad is an English-born writer currently splitting his time between Edinburgh and Pennsylvania. You can find him on Twitter…
Elon Musk: fully loaded Tesla Semi aces 500-mile drive
tesla electric semi truck debut delivery rec

Four days before Tesla delivers its first all-electric Semi truck, company chief Elon Musk has tweeted that a test drive of the new vehicle saw it complete a 500-mile trip loaded to its maximum weight.

“Tesla team just completed a 500-mile drive with a Tesla Semi weighing in at 81,000 lbs!” Musk said in his post.

Read more
Elon Musk reveals first delivery date and customer for Tesla Semi truck
tesla electric semi truck debut delivery rec

Tesla has finally started production of its all-electric Semi truck, with the first ones set for delivery to Pepsi on December 1.

The company's boss, Elon Musk, revealed the news in a tweet on Thursday evening, adding that the truck is “super fun to drive.”

Read more
Tesla’s electric Semi truck coming sooner than expected
tesla electric semi truck debut delivery rec

Tesla boss Elon Musk has said the 500-mile-range version of the company’s all-electric Semi truck will start shipping before the end of this year.

The launch date is earlier than expected after the CEO said in January that the company wouldn’t be introducing any new vehicles this year, suggesting that the truck would land some time in 2023.

Read more