Skip to main content

NASA raises issue of dwindling astronaut numbers

As NASA looks toward expanding its crewed missions with launches to the moon in the next few years and ongoing trips to the International Space Station (ISS), the agency has voiced concerns over a possible lack of astronauts to help fulfill the missions.

In a recently published report by NASA’s Office of Inspector General titled “NASA’s Management of its Astronaut Corps,” the agency revealed that after reaching a peak of nearly 150 astronauts in 2000, the size of its corps currently stands at 44, describing it as “one of the smallest cadres of astronauts in the past 20 years.”

The report noted that NASA’s planning for the training and assigning of astronauts is currently shaped by ISS missions, but added that more ambitious crewed voyages to the moon and possibly even Mars mean the agency needs to reevaluate the way it prepares for such endeavors.

Analysis conducted by NASA several years ago revealed that its astronaut corps would dip below the minimum manifest requirement in fiscal years 2022 and 2023, a situation that prompted NASA to select 10 new astronaut candidates at the end of 2021. The new recruits are now beginning a rigorous two-year training program.

But the report said the current situation means NASA may not have enough additional astronauts available to make up for “unanticipated attrition and crew reassignments,” as well as ground roles such as leadership and liaison positions, and those serving as spokespeople for the agency.

It added: “In light of the expanding space flight opportunities anticipated for the Artemis missions, the corps might be at risk of being misaligned in the future, resulting in disruptive crew reorganizations or mission delays.”

The report also highlights concerns that at the current time, NASA may not be ready to make the necessary adjustments for new astronaut training programs for lunar missions that will be markedly different from stays on the ISS, a situation that could potentially see the first crewed moon mission — Artemis II — delayed beyond its current 2024 target date.

The report made several recommendations for NASA to address the issues, including more coordination between various bodies to improve mission training and planning, and evaluation of whether it needs to increase the 15% safety margin that it currently uses to calculate the minimum size of the astronaut corps for missions over the coming five years.

With more than 12,000 people applying to become NASA astronauts in the last hiring round, there’s clearly still much interest in space exploration as a career, suggesting that the space agency has a good chance of putting things right over time.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Trio of Orion spacecraft prepped for NASA moon missions
Three NASA Orion spacecraft in production.

NASA has shared an image of three spacecraft that will play a central role in its next three Artemis missions to the moon.

Having already successfully tested the Orion spacecraft on a lunar flyby at the end of last year after being blasted into space by NASA’s new Space Launch System rocket, the American space agency is now overseeing the building of three more Orion capsules for upcoming Artemis missions.

Read more
Inside the crazy plan to scoop up and bring home a bit of the Venus atmosphere
Rendering of a heat shield deploying over Venus.

If you’ve been following space news recently, you’ve probably heard about Mars Sample Return — NASA’s ambitious plan to collect samples of Martian rocks and bring them back to Earth for study. That mission is scheduled to launch later this decade, but it will be a years-long and extremely expensive process to collect and retrieve those samples.

But Mars isn’t the only planet within visiting distance. Why don’t we hop over to our other planetary neighbor, Venus, and collect a sample from there as well?

Read more
These new NASA EVs will drive astronauts part way to the moon (sort of)
NASA's new crew transportation electric vehicles.

Three specially designed, fully electric, environmentally friendly crew transportation vehicles for Artemis missions arrived at NASA’s Kennedy Space Center in Florida this week. The zero-emission vehicles, which will carry astronauts to Launch Complex 39B for Artemis missions, were delivered by Canoo Technologies of Torrance, California. NASA/Isaac Watson

NASA has shown off a trio of new all-electric vehicles that will shuttle the next generation of lunar astronauts to the launchpad at the Kennedy Space Center.

Read more