Skip to main content

NASA sets new date for first launchpad test of its mega moon rocket

NASA will have a third go at conducting a launchpad test of its next-generation moon rocket at the Kennedy Space Center in Florida on Saturday, April 9.

This is despite the emergence of another technical issue that NASA is now working to resolve.

NASA's mega moon rocket on the launchpad at the Kennedy Space Center.
NASA’s next-generation “mega moon rocket” on the launchpad at Kennedy Space Center in Florida. NASA / NASA

Two previous attempts over the past week to begin the so-called “wet dress rehearsal” were called off due to the discovery of technical problems, the first one due to a fan issue linked to the rocket’s mobile launcher, and the second due to a stuck valve on ground equipment at the pad.

On Thursday, NASA reported the discovery of another issue, this time regarding helium purge pressure on the upper stage engine. After a troubleshooting process, engineers managed to establish a normal helium purge, but they’re continuing to investigate what caused the issue.

All being well, the two-day wet dress rehearsal will begin at the Kennedy Space Center on Saturday at 2:40 p.m. ET.

The exercise will involve NASA engineers filling the powerful Space Launch System (SLS) rocket with fuel before conducting a mock countdown.

If all goes to plan and no more technical issues appear, NASA will be able to prepare for the first launch of the SLS rocket and Orion spacecraft, hopefully in the next couple of months.

The uncrewed Artemis I mission will send Orion on a fly-by of the moon in a comprehensive test of its spaceflight systems. Artemis II will fly the same route but with a crew on board, while the highly anticipated Artemis III mission, currently slated for no earlier than 2024, will put the first woman and first person of color on the lunar surface.

It looks like NASA needs to catch a break with the long-awaited launchpad test of its next-generation rocket. Alongside the technical issues of recent days, the date for the first test attempt also had to be rescheduled after four lightning strikes hit the launchpad’s lightning towers.

Editors' Recommendations

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Watch NASA’s new solar array unfurl on the space station
A new rollout solar array on the ISS.

A view of the new rollout solar array unfolding after NASA astronauts Steve Bowen and Woody Hoburg successfully installed it to the 1B power channel on June 15, 2023. NASA TV

Two NASA astronauts completed a successful spacewalk at the International Space Station on Thursday.

Read more
Virgin Galactic reveals date for its first commercial spaceflight
VSS Unity during a test flight to the edge of space.

Virgin Galactic will embark on its first-ever commercial spaceflight in less than two weeks’ time, the company has announced.

The rocket-powered flight will mark the start of a new phase for Virgin Galactic following years of testing that saw numerous delays and also a crash that killed a pilot.

Read more
NASA performs critical tests for Artemis V moon rocket
NASA tests the SLS rocket's new RS-25 engines for the Artemis V mission.

NASA is performing hot fire tests of the new RS-25 engines that will power the agency’s Space Launch System (SLS) rocket toward the moon in the Artemis V mission, currently scheduled for 2029.

“NASA entered the stretch run of a key RS-25 certification engine test series with a successful hot fire [on] June 1, continuing to set the stage for future Artemis missions to the moon,” the agency said in a post on its website.

Read more