Skip to main content

NASA scrubs Monday’s launch of its mega moon rocket

The beginning of a new era of space exploration will have to wait after an engine issue prompted NASA to scrub Monday’s launch of its next-generation moon rocket.

Preparations in the hours leading up to the planned 8:33 a.m. ET launch of NASA’s uncrewed SLS rocket from the Kennedy Space Center in Florida had been going well. But 70 minutes from lift-off, NASA stopped the countdown clock as it tried to resolve an issue with engine number three on the rocket’s core stage.

Recommended Videos

The launch window remained open until 10:33 a.m. ET, but at 8:37 a.m. ET the space agency decided it didn’t have enough time to properly address the situation and so announced it was scrubbing Monday’s launch attempt.

The launch of #Artemis I is no longer happening today as teams work through an issue with an engine bleed. Teams will continue to gather data, and we will keep you posted on the timing of the next launch attempt. https://t.co/tQ0lp6Ruhv pic.twitter.com/u6Uiim2mom

— NASA (@NASA) August 29, 2022

The next launch window for the Artemis I mission opens on Friday, September 2, though NASA will only proceed if it’s able to resolve the engine issue by then.

The decision to halt Monday’s countdown will come as a major disappointment to the huge crowds that traveled to Florida’s Space Coast to witness what would have been the launch of NASA’s most powerful rocket to date. Millions watching online and on TV will also have to wait longer than expected to see the launch.

The mission, when it gets underway, will test the new SLS rocket and Orion spacecraft in a mission to the moon. The Orion won’t land on the lunar surface, but instead will fly around the celestial body before heading back to Earth in a mission lasting six weeks.

A successful mission, in which all of the technology performs as expected, will set NASA on course for a crewed flight taking the same route around the moon, possibly in 2024. And then, a year later, NASA will attempt the first crewed lunar landing in five decades, putting the first woman and first person of color on the surface of the moon.

NASA’s Artemis program could also see humans build a moon base for long-duration stays, with knowledge picked up from the lunar missions used for the first crewed missions to Mars, possibly in the late 2030s.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA conducts ‘moonwalks’ in the Arizona desert for Artemis lunar mission
NASA astronauts training in Arizona.

NASA astronauts Kate Rubins and Andre Douglas push a tool cart loaded with lunar tools through the San Francisco Volcanic Field north of Flagstaff, Arizona, as they practice moonwalking operations for Artemis III. NASA/Josh Valcarcel

Being an astronaut may sound glamorous, but it isn’t all rocket launches and floating around the International Space Station. The vast majority of the time is spent in training with your feet planted on terra firma.

Read more
NASA eyes levitating robot train for the moon
Artist concept of novel approach proposed by a 2024 NIAC Phase II awardee for possible future missions depicting lunar surface with planet Earth on the horizon.

An artist's concept of novel approach proposed by a 2024 NIAC Phase II awardee for possible future missions depicting lunar surface with planet Earth on the horizon. NASA/Ethan Schaler

NASA is exploring the idea of building a railway on the lunar surface that uses levitating robots to provide “reliable, autonomous, and efficient payload transport on the moon.”

Read more
NASA’s Orion spacecraft has ‘critical issues’ with its heat shield, report finds
The Orion crew module for NASA’s Artemis II mission.

The Orion crew module for NASA’s Artemis II mission. NASA/Kim Shiflett

NASA is intending to use its new Orion capsule to send astronauts to the moon under its Artemis program, but a new report finds that issues with the capsule's heat shield could be a risk to crew safety. The report from NASA's inspector general was released this week and details issues with the heat shield, which lost some material during the first flight of Orion during the Artemis I mission in 2022.

Read more