Skip to main content

NASA to perform second test of its massive SLS rocket core

The core stage for the first flight of NASA’s Space Launch System rocket is seen in the B-2 Test Stand during a hot fire test Jan. 16, 2021, at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.
The core stage for the first flight of NASA’s Space Launch System rocket is seen in the B-2 Test Stand during a hot fire test Jan. 16, 2021, at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.  NASA Television

NASA is in the process of testing the world’s largest rocket core stage, which is part of its Space Launch System (SLS) program designed to carry astronauts to the moon and eventually on further to Mars. But the project has been troubled, running over deadlines and over budget. Now, NASA has announced it will be performing a second hot fire test of the mighty SLS engines.

The hot fire test is the culmination of a test fire series called the Green Run, in which the core is powered up and the engines are fired together for the first time. The first hot fire test took place several weeks ago, but although the engines did fire successfully, they only fired for around one minutes instead of the planned eight minutes. Early data from the test indicated that the engines were shut down by automatic safety parameters after there was an issue with the power unit’s hydraulic system.

NASA says that there are no repairs required to the SLS hardware, so it now wants to try the test again. “Inspections showed the core stage hardware, including its engines, and the B-2 test stand are in excellent condition after the first hot fire test, and no major repairs are needed to prepare for a second hot fire test at NASA’s Stennis Space Center in Bay St. Louis, Mississippi,” the agency wrote in a blog post.

The plan is to conduct another hot fire test for the full eight minutes, which simulates the amount of time that the engines would be firing for in a real launch. NASA says that the test can provide additional data on the operation of the engines and reduce risk for future missions using SLS, such as the upcoming Artemis missions to the moon.

No firm date has been set for the second hot fire test, but it could be as early as the end of February.

Editors' Recommendations

Georgina Torbet
Georgina is the Digital Trends space writer, covering human space exploration, planetary science, and cosmology. She…
Watch NASA’s cinematic video of the Artemis I moon mission
The moon and Earth as seen from the Orion spacecraft in November 2022.

NASA has released a cinematic video showcasing the Artemis I mission so far.

The 96-second presentation pulls together the best footage and photos captured since the mission’s launch on November 16. You can watch it below:

Read more
NASA inks deal with SpaceX for second crewed lunar landing
Artist concept of the SpaceX Starship on the surface of the Moon.

Artist concept of the SpaceX Starship on the surface of the moon. SpaceX

NASA has inked a deal with SpaceX for a second mission to put astronauts on the lunar surface before the end of this decade.

Read more
NASA’s historic Artemis I mission finally underway with SLS rocket launch
NASA's SLS rocket launching at the start of the Artemis I mission.

NASA has successfully launched its next-generation SLS rocket and Orion spacecraft on a test flight to the moon, ushering in a new era of space exploration.

Packing 8.8 million pounds of thrust at launch, the world's most powerful operational rocket blasted off from the Kennedy Space Center in Florida at 1:47 a.m. ET on Wednesday, November 16, on its first-ever flight.

Read more