Skip to main content

Watch NASA’s animation of upcoming Artemis 1 moon mission

NASA is aiming to put the first woman and the next man on the moon in 2024, and while the target date is looking increasingly tight, the space agency is nevertheless keen to generate some early buzz around the upcoming endeavor.

The lunar landing will be the third mission in NASA’s Artemis program, which has long-term goals of establishing a permanent base on the moon and performing crewed missions to Mars.

Recommended Videos

The uncrewed Artemis 1 mission, currently set for March 2022, will perform a flyby of the moon before returning to Earth. Artemis 2 will send a crew on a flyby of the moon, while Artemis 3 will involve the highly anticipated lunar landing.

NASA this week posted a video showing how it expects the early stages of the Artemis 1 mission to play out when its almighty Space Launch System (SLS) rocket blasts off from the Kennedy Space Center next year. It’s a wonderfully detailed animation that shows many of the vital stages of the mission, and you can watch it below.

What will it look like when NASA's Space Launch System rocket launches from @NASAKennedy to the Moon for NASA's #Artemis I mission?

Hear the countdown and get a preview HERE >> https://t.co/q1Rvcv2r1g pic.twitter.com/7TnQbh8pD7

— NASA_SLS (@NASA_SLS) May 17, 2021

The SLS rocket is part of a setup that includes the Orion spacecraft, the Lunar Gateway space station, and the human landing system that will support NASA’s future space exploration initiatives.

The SLS has a height of 98.1 meters (322 feet), and at launch the core booster, together with its two outboard boosters, will produce 8.8 million pounds of thrust, “equivalent to more than 160,000 Corvette engines,” NASA says. That makes it 13% more powerful than the space shuttle and 15% more powerful than the Saturn 5 rocket, the launch vehicle used for astronaut missions to the moon 50 or so years ago.

The Orion spacecraft, which will be able to carry six astronauts on a mission lasting up to 21 days, has recently been put through a range of demanding tests, including one that involved drops into a giant tank of water to ensure it can handle splashdowns in the ocean upon return to Earth. The SLS core stage booster, meanwhile, recently experienced a lengthy barge trip from NASA’s Stennis Space Center near Bay St. Louis, Mississippi, where it underwent testing, to the Kennedy Space Center for Artemis 1 launch preparations.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA’s axed moon rover could be resurrected by Intuitive Machines
An illustration of NASA's Volatiles Investigating Polar Exploration Rover (VIPER) on the lunar surface.

Lunar scientists were shocked and dismayed last month when NASA announced that it was canceling work on its moon rover, VIPER. The Volatiles Investigating Polar Exploration Rover was intended to search the moon's south pole for evidence of water there, but NASA said that it had to ax the project due to increasing costs.

This week, an open letter to Congress called the cancellation of the mission "unprecedented and indefensible," and questioned NASA's assertion that the cancellation of the mission would not affect plans to send humans to the moon. Scientists argued that the mission was fundamental to understanding the presence of water on the moon, which is a key resource for human exploration, as well as an issue of scientific interest.

Read more
Watch NASA astronauts use VR to ‘explore’ upcoming lunar space station
A NASA astronaut uses VR to explore the Lunar Gateway.

NASA has shared footage showing astronauts using VR headsets to learn what it will be like aboard the Lunar Gateway space station.

The Lunar Gateway will orbit the moon and be used mainly for getting astronauts and cargo to and from the lunar surface during the upcoming Artemis missions. It'll also be used as a space-based laboratory similar to how the International Space Station, which is in low-Earth orbit, operates today.

Read more
Stuck Starliner is causing NASA to delay other ISS missions
SpaceX Crew-9 during training.

NASA has announced that it will delay the targeted launch date of SpaceX’s Crew-9 mission to the International Space Station (ISS) while it continues to work on resolving the situation with the troubled Starliner spacecraft.

The Starliner mission was only supposed to last about 10 days, but has been docked at the ISS since early June. An issue with some of the spacecraft's thrusters has prompted NASA engineers to carry out investigations to determine if the vehicle is safe to fly home with its two crew members on board.

Read more